Excavation along a house with the lower wall opened up and temporary supports in place, photographed during the work.

Exterior foundation work with the wall opened up, temporary posts and jacks in place and excavated ground in front

Work in progress. The ground is excavated along the house, the lower wall is opened up, and temporary posts and jacks carry the load.

Call 613-447-3084Get a Free Estimate